Our new CLT and Glulam office at the Manufacturing Facility in Sydney is well underway. This piece of Art designed by Architect James Fitzpatrick is a great example of the design possibilities and overall benefits available to us using this product and technique. Here we’ll run through the process, from Archicad model to Cadwork optimised machinery files to manufacturing and installation. We expect to finish the basic installation within 3 weeks and be ready to move in within 3 months.