Our new CLT and Glulam office at the Manufacturing Facility in Sydney is well underway. This piece of Art designed by Architect James Fitzpatrick is a great example of the design possibilities and overall benefits available to us using this product and technique. Here we’ll run through the process, from Archicad model to Cadwork optimised machinery files to manufacturing and installation. We expect to finish the basic installation within 3 weeks and be ready to move in within 3 months.
Blog Archives
- Strongbuild Blog Home
- Tag for Glulam
SEARCH
BLOG CATEGORIES
RECENT POSTS
Strongbuild Living the Timber Talk21/11/2017
AVEO Nine Storey Mass Timber Retirement Resort Tops Out26/10/2017
The Australian Timber Design Awards26/10/2017
The First Bathroom Pod Swings In06/06/2017
Pre-fabricated Mass Timber Roof Cassette Install Complete18/05/2017
Aveo’s Tall Timber Tower Begins.17/05/2017
Receive Strongbuild updates straight to your inbox
CONTACT INFO
STRONGBUILD SYDNEY
2 - 6 Lexington Drive
Bella Vista NSW 2153
P: (02) 8090 3445
F: (02) 9899 6999
E: infosydney@strongbuild.com.au
2 - 6 Lexington Drive
Bella Vista NSW 2153
P: (02) 8090 3445
F: (02) 9899 6999
E: infosydney@strongbuild.com.au
STRONGBUILD BERRY
Unit 2A Old Creamery Lane, Berry NSW 2535
PO Box 53 Berry NSW 2535
P: (02) 4464 3892 F: (02) 4464 2625
E: infoberry@strongbuild.com.au
Unit 2A Old Creamery Lane, Berry NSW 2535
PO Box 53 Berry NSW 2535
P: (02) 4464 3892 F: (02) 4464 2625
E: infoberry@strongbuild.com.au