Strongbuild’s Phoenix Apartment project in Rouse Hill is now well underway with our timber framed solution above podium (ground floor) level progressing well. We are currently installing our ‘first of its kind’ lightweight LVL walls to level 3. By using this timber framed solution, together with pre-fabricated bathroom and laundry PODS, we are able to bring our finishes trades in much earlier during the structure phase than conventional concrete framed buildings. Additionally, our timber solution has the potential to cut down on structural cycle times and we are currently achieving an 8-day floor to floor cycle. Time to bring on the finishes trades!

Arrow
Arrow
Slider